Renovation Process: Week Two

8 Dec

At the end of the second week, the floor tiles for the kitchen and toilets are laid. The rubbish chute had been fitted in too. The rest of the house has been plastered. The windows have also been installed. The concrete base for the sink has also been built with the sink fitted. A good deal of work done!

This slideshow requires JavaScript.

We also decided on the number and the location of the lighting points and power points. And do take note that lighting points and power points are charged by the numbers. So, if you have more points, the rewiring cost will be higher. Usually, the contractor would have given an estimation in the quotation. And yes, my 3rd shopping task is to shop for lighting. šŸ™‚

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: